8:59 AM, 15th January 2020, About 5 years ago
Text Size
The Ministry of Housing Communities and local government has written draft legislation proposed to come into force 1st June 2020 titled ‘The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020’ Click here.
Landlords will need to ensure that the electrical safety standards are met and ensure every electrical installation is inspected and tested at regular intervals of no more than 5 year by a qualified person
First inspection and testing must be carried out before the tenancy commences or by 1st April 2021 in relation to an existing specified tenancy.
Financial penalties faced by landlords for a breach of the above regulations will be a maximum of £30,000
This will need to be passed by the House of Commons and the Lords, but with the new government majority is unlikely to meet much resistance.
David Cox, Chief Executive, ARLA Propertymark commented:
“We are supportive of this concept and believe it will create a level playing field for all agents and landlords as well as ensuring improved safety standards for tenants. Mandating electrical testing should have a limited impact on good professional landlords and agents in the market, many of whom already voluntarily undertake these inspections. We did raise concerns about the number of engineers available to undertake these reports by the April 2021 deadline but have received assurances from MHCLG about capacity in the supply chain.”
Duties of private landlords in relation to electrical installations
3.—(1) A private landlord(7) who grants or intends to grant a specified tenancy must—
(a)ensure that the electrical safety standards are met during any period when the residential premises(8) are occupied under a specified tenancy;
(b)ensure every electrical installation in the residential premises is inspected and tested at regular intervals by a qualified person; and
(c)ensure the first inspection and testing is carried out—
(i)before the tenancy commences in relation to a new specified tenancy; or
(ii)by 1st April 2021 in relation to an existing specified tenancy.
(2) For the purposes of sub-paragraph (1)(b) “at regular intervals” means—
(a)at intervals of no more than 5 years; or
(b)where the most recent report under sub-paragraph (3)(a) requires such inspection and testing to be at intervals of less than 5 years, at the intervals specified in that report.
(3) Following the inspection and testing required under sub-paragraphs (1)(b) and (c) a private landlord must—
(a)obtain a report from the person conducting that inspection and test, which gives the results of the inspection and test and the date of the next inspection and test;
(b)supply a copy of that report to each existing tenant of the residential premises within 28 days of the inspection and test;
(c)supply a copy of that report to the local housing authority within 7 days of receiving a request in writing for it from that authority;
(d)retain a copy of that report until the next inspection and test is due and supply a copy to the person carrying out the next inspection and test; and
(e)supply a copy of the most recent report to—
(i)any new tenant of the specified tenancy to which the report relates before that tenant occupies those premises; and
(ii)any prospective tenant within 28 days of receiving a request in writing for it from that prospective tenant.
(4) Where a report under sub-paragraph (3)(a) indicates that a private landlord is or is potentially in breach of the duty under sub-paragraph (1)(a) and the report requires the private landlord to undertake further investigative or remedial work, the private landlord must ensure that further investigative or remedial work is carried out by a qualified person within—
(a)28 days; or
(b)the period specified in the report if less than 28 days,
starting with the date of the inspection and testing.
(5) Where paragraph (4) applies, a private landlord must—
(a)obtain written confirmation from a qualified person that the further investigative or remedial work has been carried out and that—
(i)the electrical safety standards are met; or
(ii)further investigative or remedial work is required;
(b)supply that written confirmation, together with a copy of the report under sub-paragraph (3)(a) which required the further investigative or remedial work to each existing tenant of the residential premises within 28 days of completion of the further investigative or remedial work; and
(c)supply that written confirmation, together with a copy of the report under sub-paragraph (3)(a) which required the further investigative or remedial work to the local housing authority within 28 days of completion of the further investigative or remedial work.
(6) Where further investigative work is carried out in accordance with paragraph (4) and the outcome of that further investigative work is that further investigative or remedial work is required, the private landlord must repeat the steps in paragraphs (4) and (5) in respect of that further investigative or remedial work.
(7) For the purposes of sub-paragraph (3)(e)(ii) a person is a prospective tenant in relation to residential premises if that person—
(a)requests any information about the premises from the prospective landlord for the purpose of deciding whether to rent those premises;
(b)makes a request to view the premises for the purpose of deciding whether to rent those premises; or
(c)makes an offer, whether oral or written, to rent those premises.
Duty of local housing authority to serve a remedial notice
4.—(1) Where a local housing authority has reasonable grounds to believe that, in relation to residential premises situated within its area, a private landlord is in breach of one or more of the duties under regulation 3(1)(a), (1)(b), (1)(c), (4) and (6), and the most recent report under regulation 3(3) does not indicate that urgent remedial action is required, the authority must serve a remedial notice on the private landlord.
(2) A remedial notice must—
(a)specify the premises to which the notice relates;
(b)specify the duty or duties that the local housing authority considers the private landlord has failed to comply with;
(c)specify the remedial action the local housing authority considers should be taken;
(d)require the private landlord to take that action within 28 days beginning with the day on which the notice is served;
(e)explain that the private landlord is entitled to make written representations against the notice within 21 days beginning with the day on which the notice is served;
(f)specify the person to whom, and the address (including if appropriate any email address) to which, any representations may be sent; and
(g)explain the effect of regulations 11 and 12, including the maximum financial penalty which a local housing authority may impose.
(3) The local housing authority must serve a remedial notice within 21 days beginning with the day on which the authority decides it has reasonable grounds under paragraph (1).
(4) The local housing authority must consider any representations made under paragraph (2).
(5) Where a private landlord makes written representations the remedial notice is suspended until the local housing authority has complied with paragraphs (4) and (6).
(6) The local housing authority must—
(a)inform the private landlord in writing of the outcome of the consideration under paragraph (4) within 7 days beginning with the day on which the period under sub-paragraph (2)(e) expires; and
(b)where the outcome of the consideration under paragraph (4) is to confirm the remedial notice, confirm that notice and inform the private landlord in writing that the remedial notice is confirmed and the suspension under paragraph (5) ceases to have effect.
(7) The local housing authority may withdraw the remedial notice at any time.
Duty of private landlord to comply with a remedial notice
5.—(1) Where a remedial notice is served on a private landlord, the private landlord must take the remedial action specified in the notice within—
(a)where no representations are made under regulation 4(2) and the remedial notice is not withdrawn, the period specified in regulation 4(2)(d); or
(b)where representations are made under regulation 4(2) and the outcome of the consideration under regulation 4(4) is to confirm the remedial notice, 21 days from the day on which the private landlord is informed that the suspension under regulation 4(5) ceases to have effect.
(2) A private landlord is not to be taken to be in breach of the duty under paragraph (1) if the private landlord can show they have taken all reasonable steps to comply with that duty.
(3) For the purposes of paragraph (2), where a private landlord is prevented from entering the residential premises to which the duty under paragraph (1) relates by the tenant or tenants of those premises, the private landlord will not be considered to have failed to have taken all reasonable steps to comply with the duty under paragraph (1) solely by reason of a failure to bring legal proceedings with a view to securing entry to the premises.
Power of local housing authority to arrange remedial action
6.—(1) Where a local housing authority is satisfied, on the balance of probabilities, that a private landlord on whom it has served a remedial notice is in breach of the duty under regulation 5(1), the authority may, with the consent of the tenant or tenants of the premises in relation to which the remedial action is to be taken, arrange for an authorised person to enter those premises to take the remedial action specified in the remedial notice.
(2) Before the remedial action is taken the local housing authority must serve a notice on the private landlord specifying—
(a)the premises in relation to which the remedial action is to be taken by the authorised person under paragraph (1) and the nature of that remedial action;
(b)the power under which the remedial action is to be taken by the authorised person in paragraph (1);
(c)the date when the remedial action will be taken by the authorised person; and
(d)the right of appeal under regulation 7 against the decision of the authority to arrange for an authorised person to take the remedial action.
(3) The local housing authority must arrange for an authorised person to take the remedial action within 28 days of—
(a)the end of the notice period in regulation 7(3) where there is no appeal; or
(b)an appeal decision that confirms or varies the decision of the local housing authority where there is an appeal.
(4) An authorised person must—
(a)give not less than 48 hours’ notice of the remedial action to the tenant or tenants of the residential premises on which it is to be taken; and
(b)if required to do so by or on behalf of the private landlord or tenant or tenants, produce evidence of identity and authority.
11.—(1) Where a local housing authority is satisfied, beyond reasonable doubt, that a private landlord has breached a duty under regulation 3, the authority may impose a financial penalty (or more than one penalty in the event of a continuing failure) in respect of the breach.
(2) A financial penalty—
(a)may be of such amount as the authority imposing it determines; but
(b)must not exceed £30,000.
Previous Article
Shelter research playing on fearsNext Article
Is size everything?
EECLondon
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up18:20 PM, 19th January 2020, About 5 years ago
Reply to the comment left by Seething Landlord at 19/01/2020 - 17:53
Fire risk if you get conductivity to fabric of the building through lose connections and an increase in temperature causing thermal damage. The circuit may not automatically disconnect because sufficient current may not flow. In any case a risk exists on a metal unit if it is not connected to earth. To try and explain all aspects would take more time than is worth while.
Dylan Morris
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up18:20 PM, 19th January 2020, About 5 years ago
Reply to the comment left by B4lamb at 19/01/2020 - 18:15
Where does it say that then ?
B4lamb
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up18:21 PM, 19th January 2020, About 5 years ago
EECLondon
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up18:21 PM, 19th January 2020, About 5 years ago
Reply to the comment left by Dylan Morris at 19/01/2020 - 18:04
Costs about £150.00 in London area and takes about 2 or so hours.
Dylan Morris
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up18:22 PM, 19th January 2020, About 5 years ago
Reply to the comment left by EECLondon at 19/01/2020 - 18:21
Thanks ......I can live with £150 not too bad.
Jk
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up18:29 PM, 19th January 2020, About 5 years ago
EECLondon
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up18:34 PM, 19th January 2020, About 5 years ago
Reply to the comment left by Seething Landlord at 19/01/2020 - 17:53
The new regulation states “electrical safety standards” means the standards for electrical installations in the eighteenth edition of the Wiring Regulations, published by the Institution of Engineering and Technology and the British Standards Institution as BS 7671: 2018;
Chapter 65 of the 18th Edition qualifies if it complies with previous standards it is still satisfactory. Believe it or not the 18th Edition is about to be amended and published in the next year or so. So Landlords think they get a hard time. The people trying to keep up with the regulations can get a bit upset as well. We all have the same problem when we stand and get our future decided by the 12 people sitting across from us if we fail in our duty of care.
EECLondon
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up18:41 PM, 19th January 2020, About 5 years ago
Reply to the comment left by B4lamb at 19/01/2020 - 18:15
A new installation in a domestic dwelling can have an interval of 10 years before it is due an inspection. This is as recommended by BS7671 2018. This will now be a bit misleading because when a job is new and certified a qualification will need to be added if the property is let out it will need to be every 5 years. The designer, installer & inspector may not know the full intentions of the person who owns the dwelling. This new legislation more refers to durations for the legislation to comply with it.
EECLondon
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up18:48 PM, 19th January 2020, About 5 years ago
Reply to the comment left by Dylan Morris at 19/01/2020 - 18:04
(c)ensure the first inspection and testing is carried out—
(i)before the tenancy commences in relation to a new specified tenancy.
Is this not interpreted if you got an inspection done on the 1st July 2020 and you have an inspection and then you generate a new tenancy in 1st July 2021 you have created a new tenancy and in such can only comply if you get an new electrical inspection done. The same would apply if you generated a new tenancy agreement 6 months after 1/07/2020. So it would be change of tenancy.
Michael Barnes
Become a Member
If you login or become a member you can view this members profile, comments, posts and send them messages!
Sign Up19:20 PM, 19th January 2020, About 5 years ago
I'm late to the party, but having read the comments it appears to me that the sparkys are considering what the "eighteenth edition" says, but not what the proposed regulations for PRS landlords say.
It is not clear from the proposed regulations if a C3 would need to be addressed or not (e.g. red and black wires rather than brown and blue).
This is what needs to be clear, and we should be writing to our MPs about (I have already).